Sample type: Waste/construction material
Analysis type: Organic compounds
Analysis of substance: | Report limit: |
---|---|
PCB 28 | 0.002 mg/kg |
PCB 52 | 0.002 mg/kg |
PCB 101 | 0.002 mg/kg |
PCB 118 | 0.002 mg/kg |
PCB 138 | 0.002 mg/kg |
PCB 153 | 0.002 mg/kg |
PCB 180 | 0.002 mg/kg |
sum PCB 7 | 0.007 mg/kg |
Bygg-OJ-2aQ PCB 7 in concrete
Package info
1 510 SEK / sample10 work days
3 work days
1
Waste/construction material
Organic compounds
50 g dry matter
diffusion-tight plastic bag 18x35 cm
GC-ECD
Yes, Expresstariff 1.1: SameDay +350%; Q12 300%; Q17 +200%; 1 day +100%; 2 days +75%; 3 days +40%; 4 days +30%; 5 days +20%
Yes
Cost for sample preparation may be added.
If there is a small amount of sample or due to matrix interferences, the reporting limit can be raised
LOR refers to pure concrete
The analysis is accredited for concrete and brick.